{"id":9531,"date":"2024-12-04T05:00:52","date_gmt":"2024-12-04T05:00:52","guid":{"rendered":"https:\/\/www.rbc.com\/en\/thought-leadership\/power-struggle-how-ai-is-challenging-canadas-electricity-grid\/"},"modified":"2026-04-16T17:06:46","modified_gmt":"2026-04-16T17:06:46","slug":"power-struggle-how-ai-is-challenging-canadas-electricity-grid","status":"publish","type":"rbc_tl","link":"https:\/\/www.rbc.com\/en\/thought-leadership\/climate-action-institute\/energy-reports\/power-struggle-how-ai-is-challenging-canadas-electricity-grid\/","title":{"rendered":"Power Struggle: How AI is challenging Canada\u2019s  electricity grid"},"content":{"rendered":"<p><strong>Artificial intelligence (AI) is rapidly reshaping the global economy, driven by Big Tech\u2019s breakthrough apps such as OpenAI\u2019s ChatGPT.<\/strong> Businesses are eyeing ways to transform their operations through AI, which has serious implications\u2014transformative and disruptive\u2014for the wider economy. At the heart of this AI-driven transformation are data centres, the crucial infrastructure powering applications, from simple queries to complex generative tasks.<\/p>\n<p>Every AI prompt requires significant computing power. A single ChatGPT query consumes 10 times more energy than a standard Google search. More advanced AI operations such as generating text or images, exponentially spike power consumption. Canadian data centres\u2019 rising energy demands make them a major driver of electricity demand growth. If all the data centre projects currently being reviewed by regulators proceed, they would account for 14% of Canada\u2019s total power needs by 2030<sup>1<\/sup>, similar to 12-15% by 2030 in the U.S.<sup>2<\/sup><\/p>\n<p>The development of these data centres, likely between 20 to 30, would result in $100 billion in capital expenditures related to the construction and build of accompanying IT infrastructure<sup>3<\/sup>. However, AI\u2019s energy-intensive nature raises concerns about power availability, grid reliability and its implication on emissions.<\/p>\n<p><!--Collapsible content  --><\/p>\n<div id=\"accordionSet1\" class=\"accordion\">\n<div class=\"accordion-panel\" style=\"padding:10px 0 10px 0;margin:10px 0 10px 0\">\n    <button id=\"accordion1-title1000\" class=\"collapse-toggle collapsed\" data-target=\"#accordion1-1000\" data-toggle=\"collapse\" data-parent=\"\" aria-expanded=\"true\" aria-controls=\"accordion1000\"><\/p>\n<p class=\"rec\"><strong>The power behind ChatGPT:<\/strong> How data centres process search queries<\/p>\n<p>    <\/button><\/p>\n<div id=\"accordion1-1000\" class=\"collapse-content collapse\" role=\"region\" aria-labelledby=\"accordion1-title1000\">\n<div class=\"collapse-inner\">\n <img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/www.rbc.com\/en\/wp-content\/uploads\/sites\/4\/2025\/03\/AI-Report-Schematic-01-scaled-1.jpg\" alt=\"\" width=\"2560\" height=\"1310\" class=\"alignnone size-full wp-image-63877\" \/><\/p><\/div>\n<\/p><\/div>\n<\/p><\/div>\n<\/div>\n<p><!--1. Definition Ends--><\/p>\n<h2 id=\"key\" class=\"anchor sp-title\">Key Findings<\/h2>\n<ul class=\"key-finding\">\n<li>\n<div class=\"key-finding-img\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/www.rbc.com\/en\/wp-content\/uploads\/sites\/4\/2025\/03\/key-finding-07.png\" alt=\"\" width=\"834\" height=\"834\" class=\"alignnone size-full wp-image-63809\" \/><\/div>\n<div class=\"key-finding-text\">Canadian regulators are reviewing data centre applications with an estimated combined capacity of 15 gigawatts\u2014enough to power seven out of 10 homes nationwide. <\/div>\n<\/li>\n<li>\n<div class=\"key-finding-img\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/www.rbc.com\/en\/wp-content\/uploads\/sites\/4\/2025\/03\/key-finding-11.png\" alt=\"\" width=\"834\" height=\"834\" class=\"alignnone size-full wp-image-63811\" \/><\/div>\n<div class=\"key-finding-text\">AI is the primary driver of this surge, with data centres offering a $100 billion economic opportunity for the construction and build out of data centres and accompanying data infrastructure.<\/div>\n<\/li>\n<li>\n<div class=\"key-finding-img\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/www.rbc.com\/en\/wp-content\/uploads\/sites\/4\/2025\/03\/key-finding-09.png\" alt=\"\" width=\"834\" height=\"834\" class=\"alignnone size-full wp-image-63812\" \/><\/div>\n<div class=\"key-finding-text\">Canada\u2019s clean energy resources offer a strategic advantage for AI-driven growth. However, natural gas remains a critical part of the mix due to its reliability. Nuclear power is also an option but with a considerably longer lead time.<\/div>\n<\/li>\n<li>\n<div class=\"key-finding-img\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/www.rbc.com\/en\/wp-content\/uploads\/sites\/4\/2025\/03\/key-finding-06.png\" alt=\"\" width=\"834\" height=\"834\" class=\"alignnone size-full wp-image-63808\" \/><\/div>\n<div class=\"key-finding-text\">Canada\u2019s annual emissions could rise 3%, if natural gas powers six additional gigawatts of data centres. However, carbon capture and storage (CCS) could throttle the rise of emissions. <\/div>\n<\/li>\n<li>\n<div class=\"key-finding-img\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/www.rbc.com\/en\/wp-content\/uploads\/sites\/4\/2025\/03\/key-finding-08.png\" alt=\"\" width=\"834\" height=\"834\" class=\"alignnone size-full wp-image-63810\" \/><\/div>\n<div class=\"key-finding-text\">Local data centres strengthen Canada\u2019s position in AI by securing data sovereignty and enhancing cybersecurity.<\/div>\n<\/li>\n<li>\n<div class=\"key-finding-img\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/www.rbc.com\/en\/wp-content\/uploads\/sites\/4\/2025\/03\/key-finding-05.png\" alt=\"\" width=\"834\" height=\"834\" class=\"alignnone size-full wp-image-63807\" \/><\/div>\n<div class=\"key-finding-text\">Streamlining AI governance across Canada and the U.S. is a key next step in securing North American leadership. A review of CUSMA in 2026 would likely see refinements to the digital trade chapter.<\/div>\n<\/li>\n<li>\n<div class=\"key-finding-img\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/www.rbc.com\/en\/wp-content\/uploads\/sites\/4\/2025\/03\/key-finding-10.png\" alt=\"\" width=\"834\" height=\"834\" class=\"alignnone size-full wp-image-63813\" \/><\/div>\n<div class=\"key-finding-text\">Targeted efforts to increase AI adoption among Canadian SMEs\u2014which account for half of Canadian GDP\u2014could help reverse Canada\u2019s lagging productivity.<\/div>\n<\/li>\n<\/ul>\n<h2 id=\"new\" class=\"anchor sp-title\">A new trading chip<\/h2>\n<p>Canada faces a strategic moment as it captures the AI opportunity. Beyond the economic incentives, local data centres are essential for ensuring data privacy, national security, and resilience against cyber threats.<\/p>\n<p>We can leverage our prodigious hydro, natural gas and nuclear power to emerge as a low-cost data centre hub. We can also build on this advantage further by harnessing AI\u2019s power to boost Canadian productivity, enhance our competitiveness, and deepen our digital talent pool. <\/p>\n<p>The AI opportunity also has trade and geopolitical implications, especially as Canada needs ever more chips to bargain with a transactional U.S. administration-in-waiting. With Washington increasingly focused on China, data sovereignty could become a key focus over the next few years. This provides Canada plenty of opportunities\u2014but also some risks.<\/p>\n<p>We could be a valuable partner for the U.S. and create a digital North American fortress, securely warehousing critical data at low cost. But that would require a realignment on data sovereignty between the two countries, which would most likely occur at the next round of Canada-United States-Mexico Agreement (CUSMA) in 2026.<\/p>\n<p>A modernized digital trade chapter\u2014Chapter 19\u2014was a factor that drove Washington to seek a revised trade agreement during U.S. President Donald Trump\u2019s first term. The next iteration of Chapter 19 could increase the focus on compatibility of North American data, both in terms of cross-border transfers and AI governance.<\/p>\n<div id=\"everviz-xl-xQl_go\" class=\"everviz-xl-xQl_go\"><\/div>\n<h2 id=\"pow\" class=\"sp-title anchor\">Powering up data centres<\/h2>\n<p>Substantial demand from \u201chyperscalers\u201d\u2014data centres with large compute capabilities\u2014could strain Canada\u2019s grid and drive up power bills, putting governments and regulators in a bind, as recently evidenced with the U.S. federal energy regulator\u2019s refusal to allow Amazon Inc. to purchase more power from a Pennsylvania nuclear facility on the grounds it would raise customer rates and threaten grid reliability.  <\/p>\n<p>It also comes at a time many Canadian provinces are already facing sizeable power demands from population growth and electrified transport, as well as ambitions to decarbonize heavy industries. All told, Canada\u2019s power demand was already set to double by 2050, potentially even triple<sup>4<\/sup>. And that was before AI became a compelling need for the global economy.<\/p>\n<p>Canada has several energy sources it can draw on to power data centres, but each comes with its own challenges and considerations:<\/p>\n<ul class=\"key-finding\">\n<li>\n<div class=\"key-finding-img\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/www.rbc.com\/en\/wp-content\/uploads\/sites\/4\/2025\/03\/power-icon-03.png\" alt=\"\" width=\"834\" height=\"834\" class=\"alignnone size-full wp-image-63798\" \/><\/div>\n<div class=\"key-finding-text\"><strong>Wind and solar:<\/strong> growing sources of power but in the absence of storage, their intermittency makes them unsuitable for data centres that demand consistent baseload power.<\/div>\n<\/li>\n<li>\n<div class=\"key-finding-img\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/www.rbc.com\/en\/wp-content\/uploads\/sites\/4\/2025\/03\/power-icon-01.png\" alt=\"\" width=\"834\" height=\"834\" class=\"alignnone size-full wp-image-63799\" \/><\/div>\n<div class=\"key-finding-text\"><strong>Nuclear:<\/strong> The emerging energy of choice for Big Tech in the U.S. It\u2019s an option in Ontario, too, but would require long lead times stretching out to a decade, if not more. Nuclear remains a viable long-term solution.<\/div>\n<\/li>\n<li>\n<div class=\"key-finding-img\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/www.rbc.com\/en\/wp-content\/uploads\/sites\/4\/2025\/03\/power-icon-02.png\" alt=\"\" width=\"834\" height=\"834\" class=\"alignnone size-full wp-image-63800\" \/><\/div>\n<div class=\"key-finding-text\"><strong>Hydro:<\/strong> Several provinces such as Quebec and British Columbia already rely heavily on the power source, and, like nuclear, would require a long time to boost capacity.<\/div>\n<\/li>\n<li>\n<div class=\"key-finding-img\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/www.rbc.com\/en\/wp-content\/uploads\/sites\/4\/2025\/03\/naturalgas.png\" alt=\"\" width=\"834\" height=\"834\" class=\"alignnone size-full wp-image-63922\" \/><\/div>\n<div class=\"key-finding-text\"><strong>Natural gas:<\/strong> Alberta\u2019s preferred option, and a key part of Ontario\u2019s transition until 2040. But powering AI through natural gas comes with an emissions cost that provinces will need to weigh.<\/div>\n<\/li>\n<\/ul>\n<h2 id=\"provincial\" class=\"anchor sp-title\">Provincial Imperatives: <span style=\"font-weight:400\">Honing regional approaches to AI<\/span><\/h2>\n<p>Provinces will ultimately drive Canada\u2019s AI ambition.<\/p>\n<p>Alberta, with ample natural gas and lower grid pressures, prefers data centres operate off-grid, minimizing the strain on public grids. The \u201cbring your own power\u201d (BYOP) model allows for faster deployment and supports local natural gas prices, driving economic benefits for the province. It is also aligned with the proposed Canadian Electricity Regulations, given the facilities would not be net exporters to the grid. However, BYOP is not necessarily a viable model for all Canadian jurisdictions.<\/p>\n<p>Quebec, with its rigorous environmental standards and cap-and-trade system, prioritizes low-emission solutions. The province\u2019s hydro power provides clean energy but its capacity to meaningfully expand hydro in the short term is limited. British Columbia faces similar constraints, with a preference for hydroelectric power and tight regulations on carbon-intensive energy sources.<\/p>\n<p>Ontario\u2019s more flexible energy policy allows for a mix of solutions. Its population density and industrial base create competing demands for grid capacity\u2014from electric vehicle and battery supply chain to greenhouses. The province\u2019s primary challenge will be to strike a balance between these competing needs.<\/p>\n<div id=\"everviz-yalrEkfT7\" class=\"everviz-yalrEkfT7\"><\/div>\n<p>Decisions about where and how to build data centres will involve a complex matrix of economic, environmental, and social factors. Our research shows that data centres rank higher in GDP impact compared to, say, manufacturing  and transport, but contribute fewer jobs compared to those industries.<\/p>\n<p>That\u2019s where federal and provincial alignment will be critical to Canada\u2019s AI strategy. Policymakers will need to create frameworks that allow provinces to develop bespoke policies that balance growth, sustainability and the demands of the new economy. This includes targeted support for AI adoption among SMEs and ensuring that data centres contribute to productivity gains across sectors. For example, as part of a greater commitment to invest $25 billion in Canadian data centres, Amazon Web Services (AWS) apportioned dedicated compute capacity to the University of Alberta in 2023, sourced from a recently completed $4-billion cloud computing data centre in Calgary.<\/p>\n<h2 id=\"power\" class=\"anchor sp-title\">Power Supply: <span style=\"font-weight:400\">Capturing the \u2018hyperscaler\u2019 opportunity<\/span><\/h2>\n<p>Data centres require vast amounts of electricity, ranging from 200 megawatts to 500 megawatts. Canada\u2019s low-cost, clean energy gives it a significant advantage. Hydroelectric and nuclear power in cities like Montreal, Vancouver, and Toronto offers some of the cheapest and cleanest electricity in North America. Comparatively, U.S. industrial power prices in key data centre states such as Arizona, Illinois, and Texas are on average 30-40% more expensive, and that excludes their warm climates adding an extra 20-40% power for cooling purposes.<\/p>\n<p>Global hyperscalers are seizing on the Canadian opportunity. We estimate various provinces are reviewing applications for 15 GW of new data centre capacity\u2014a 20-fold increase from current levels<sup>5<\/sup> and enough to power 70% of Canadian households today. In addition, the \u201cexpressed interest\u201d in data centres is likely far greater. Alberta alone is being pitched proposals for 50 projects with a combined capacity of 20 GW<sup>6<\/sup>.<\/p>\n<p>The mass electrification of the economy is already expected to place unprecedented demand on Canada\u2019s grids. Canada\u2019s power generation is expected to reach 750 GWh<sup>7<\/sup> over the next ten years, compared to an estimated demand of 875 GWh<sup>8<\/sup>, implying a shortfall of about 15%. It underscores the need for careful resource management.<\/p>\n<div id=\"everviz-pebLw1BnH\" class=\"everviz-pebLw1BnH\"><\/div>\n<h2 id=\"emi\" class=\"anchor sp-title\">Emissions: <span style=\"font-weight:400\">Leveraging carbon capture<\/span><\/h2>\n<p>AI\u2019s energy footprint raises concerns about Canada\u2019s climate goals. With provinces being asked to provide power for important industries such as heavy industry, liquefied natural gas electrification and greenhouses, most provinces will have to determine where data centres fit with their economic priority and emissions-cutting ambitions.<\/p>\n<p>Data centres depend on consistent baseload power, which wind and solar cannot reliably provide due to their intermittent nature. New renewable projects are also facing opposition in certain jurisdictions. Natural gas, with its reliability as baseload power and quick scalability, can fill the gap. <\/p>\n<p>However, using gas for data centres raises emissions concerns. If natural gas powers six additional gigawatts of data centres, annual emissions could rise by 16 million tonnes of CO2e\u2014a 3% increase<sup>9<\/sup> in Canada\u2019s total emissions. <\/p>\n<p>Carbon capture and storage (CCS) could throttle the rise of emissions. In Alberta, companies are already in discussions to incorporate carbon capture into gas-fired power plants for data centres. That would alleviate environmental concerns, leverage existing energy infrastructure and drive further investments in natural gas production and the development of CCS.<\/p>\n<p>Big Tech companies, that are investing heavily in nuclear power in the U.S. to feed their AI operations, could replicate that playbook with abated natural gas in Canada.<\/p>\n<p>However, the high costs and technical complexities of CCS mean it\u2019s not an all-of-Canada solution. While the CCS technology is readily transferable, only Alberta and Saskatchewan have the required geology and infrastructure in Canada to store carbon.<\/p>\n<div id=\"everviz-FDK6RXjF1\" class=\"everviz-FDK6RXjF1\"><\/div>\n<h2 id=\"eco\" class=\"anchor sp-title\">Economy: <span style=\"font-weight:400\">Unlocking a $100-billion opportunity<\/span><\/h2>\n<p>The digital economy is expanding rapidly, from cloud computing to AI applications, and transforming every aspect of the economy. <\/p>\n<p>Current estimates suggest the digital economy accounts for 6.3% of Canada\u2019s GDP, but broader estimates place it at 15%\u2014and it\u2019s growing 2.5 times faster than conventional economic sectors<sup>10<\/sup>. Data centres are critical to this digital ecosystem, hosting and processing the vast volumes of data generated by AI and other advanced technologies. Development of the proposed data centres alone could spark a $100-billion construction and IT infrastructure boom, in addition to its positive impact on the wider economy.<\/p>\n<p>But there\u2019s an even greater prize for Canadian businesses: an AI ecosystem that helps them gain a competitive edge in areas as diverse as healthcare, autos, manufacturing and clean-tech. That could be in the form of AI revolutionizing biotech research, accurately detecting weather patterns, or improving navigation in autonomous vehicles.<\/p>\n<p>Canada\u2019s AI adoption, however, lags its peers. Only 35% of Canadian firms use AI, compared to 72% in the U.S.<sup>11<\/sup> The discrepancy is partially due to the high percentage of small and medium-sized enterprises (SMEs) in Canada, which employ 65% of the private workforce<sup>12<\/sup>. SMEs often lack the capital and talent to invest in cutting-edge technology. Addressing this gap is essential to boosting Canadian productivity, which has been in decline for more than 30 years<sup>13<\/sup>. With its R&amp;D spending at 1.7% of GDP<sup>14<\/sup>\u2014less than half of U.S. levels\u2014Canada faces an urgent need to increase investment in AI and technological innovation.<\/p>\n<p>The federal government has taken steps to close the productivity gap, launching initiatives such as the $2-billion AI Compute Access Fund to boost Canadian businesses\u2019 technological capabilities. The fund aims to deliver computational power needed to drive innovation in both large companies and SMEs. <\/p>\n<p>Bridging the AI adoption gap is critical not only for immediate economic gains, but also for positioning Canada as a global leader in the technology. This includes deepening the country\u2019s AI-ready workforce, with training programs and partnerships with academic institutions key to fostering a new generation of AI professionals.<\/p>\n<h2 id=\"data\" class=\"anchor sp-title\">Data Security: <span style=\"font-weight:400\">Safeguarding sovereignty and privacy<\/span><\/h2>\n<p>Data sovereignty is also crucial. Canada\u2019s strict data privacy laws mandate that sensitive information remains within its borders, ensuring compliance and protecting citizens\u2019 privacy. As digital data grows, so do cyber risks. IBM reports 27,000 data breaches in Canada annually, with potential economic losses in the billions.<\/p>\n<p>But keeping data within borders has two inherent tradeoffs: on power and trade. Data centres\u2019 impact on the grid, to date, has been marginal given that in Canada they are used largely for hosting purposes. The proliferation of AI and resulting power draw from hyperscalers, however, accentuates this tradeoff. Most likely, segments of demand will still likely require to be hosted locally, i.e., for economically sensitive areas such as government, healthcare, banking and insurance, and research and development where latency can impact effectiveness.<br \/>\nFor other pockets of demand, such as e-commerce, an integrated North American data corridor, as envisioned by OpenAI CEO Sam Altman, could result in comparative advantages for less constrained jurisdictions to power North America\u2019s AI economy. But that would require greater collaboration between Canada and the United States. <\/p>\n<p>Data centres can also help Canada build on its AI expertise. The country has been a leader in AI research since the 1980s, thanks to renowned academics including Geoffrey Hinton and Yoshua Bengio. Yet, the country\u2019s lack of domestic AI infrastructure threatens its leadership. To remain competitive, Canada must likely prioritize dedicated data resources for public sectors such as healthcare, education, and defence. These resources are essential for fostering innovation and maintaining Canada\u2019s technological edge.<\/p>\n<h2 id=\"con\" class=\"anchor sp-title\">Conclusion <\/h2>\n<p>There\u2019s an opportunity for Canada to build on its AI leadership beyond economic considerations and productivity. An AI ecosystem can infuse the wider economy with tools that crunch big data and algorithms to boost domestic companies\u2019 competitiveness in areas as diverse as healthcare, clean-tech, manufacturing and services and transportation and logistics.<\/p>\n<p>A flexible approach, combined with federal collaboration, would ensure Canada\u2019s AI infrastructure powers the digital economy in a way that aligns with the country\u2019s broader sustainability, security, and economic goals.<\/p>\n<p><!-- Section Contributors: --><\/p>\n<div class=\"box-contri\">\n<h4 id=\"contributors\" class=\"anchor\">Contributors:<\/h4>\n<p style=\"color: white\"><strong>Shaz Merwat,<\/strong> Energy Policy Lead, RBC Climate Action Institute<\/p>\n<p style=\"color: white;margin-top:20px\"><b>Yadullah Hussain, <\/b> Managing Editor, RBC Climate Action Institute<\/p>\n<p style=\"color: white\"><strong>Caprice Biasoni,<\/strong> Graphic Design Specialist<\/p>\n<p style=\"color: white\"><strong>Shiplu Talukder,<\/strong> Digital Publishing Specialist <\/p>\n<\/div>\n<div id=\"accordionSetReferences\" class=\"accordion mar-tb-0\"><!-- References--><\/p>\n<div class=\"accordion-panel\">\n<p class=\"no-mar\"><button id=\"accordion-titleReferences\" class=\"collapse-toggle collapsed\" data-target=\"#accordionReferences\" data-toggle=\"collapse\" data-parent=\"#accordionSetReferences\" aria-expanded=\"false\" aria-controls=\"accordionReferences\">References<\/button><\/p>\n<div id=\"accordionReferences\" class=\"collapse-content collapse\" role=\"region\" aria-labelledby=\"accordion-titlReferences3\">\n<div class=\"collapse-inner\">\n<ol class=\"for-ref\">\n<li> The data centre power estimate is based on the current set of data centre projects believed to be in application with provincial electricity regulators. Total estimated power consumption for Canada by 2030 is taken from the Canada Electricity Advisory Council. <\/li>\n<li>  As estimated by S&amp;P Global, BCG and McKinsey. <\/li>\n<li>  Estimate is based on total data centre build costs, including land costs, construction costs, and accompanying data processing and networking, and power and cooling expenses.<\/li>\n<li> Electricity Advisory Council of Canada<\/li>\n<li>  <a href=\"https:\/\/www.spglobal.com\/commodityinsights\/en\/market-insights\/latest-news\/energy-transition\/100224-canada-prepares-for-increased-electric-loads-as-country-attracts-data-centers#:~:text=Data%20from%20Mordor%20Intelligence%20estimates,GW%20market%20size%20\">S&amp;P Global Market Intelligence<\/a><\/li>\n<li>  <a href=\"https:\/\/calgaryherald.com\/opinion\/columnists\/varcoe-huge-data-centre-projects-alberta-power-lineup\">Calgary Herald<\/a><\/li>\n<li>  S&amp;P Global<\/li>\n<li>  Electricity Advisory Council of Canada<\/li>\n<li>  Carbon emission estimate of 16 million tonnes of CO2e is based on an assumption of 360 kg\/MWh at 6 GW of capacity<\/li>\n<li>  <a href=\"https:\/\/www.statcan.gc.ca\/en\/subjects-start\/digital_economy_and_society\">Statistics Canada<\/a> <\/li>\n<li>  KPMG<\/li>\n<li>  Innovation, Science and Economic Development Canada <\/li>\n<li> Statistics Canada<\/li>\n<li> <a href=\"https:\/\/www150.statcan.gc.ca\/t1\/tbl1\/en\/tv.action?pid=2710035901\">Statistics Canada<\/a><\/li>\n<\/ol>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<h3>Related Reading<\/h3>\n<div class=\"mass\">\n<div class=\"mass-timber-ra\">\n<p><a href=\"https:\/\/thoughtleadership.rbc.com\/genai-is-canada-ready\/\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-50031\" src=\"https:\/\/www.rbc.com\/en\/wp-content\/uploads\/sites\/4\/2025\/03\/AI-Banner_Banner-584x300-1.png\" alt=\"\" width=\"584\" height=\"301\" \/><\/a><\/p>\n<p class=\"mass-title-ra tx-left\"><a href=\"https:\/\/thoughtleadership.rbc.com\/genai-is-canada-ready\/\">GenAI: Is Canada ready?<\/a><\/p>\n<\/div>\n<div class=\"mass-timber-ra border-side-ra\">\n<p><a href=\"https:\/\/thoughtleadership.rbc.com\/think-small-how-canada-can-make-small-modular-nuclear-reactors-a-priority\/\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-46439\" src=\"https:\/\/www.rbc.com\/en\/wp-content\/uploads\/sites\/4\/2025\/03\/SMR-Report-Blog-image_Banner-1-584x300-1.jpg\" alt=\"\" width=\"584\" height=\"301\" \/><\/a><\/p>\n<p class=\"mass-title-ra tx-left\"><a href=\"https:\/\/thoughtleadership.rbc.com\/think-small-how-canada-can-make-small-modular-nuclear-reactors-a-priority\/\">Think Small: How Canada can make small modular nuclear reactors a priority<\/a><\/p>\n<\/div>\n<div class=\"mass-timber-ra\">\n<p><a href=\"https:\/\/thoughtleadership.rbc.com\/canadas-energy-transformation-an-outlook-of-supply-and-demand-in-the-2030s\/\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-57743\" src=\"https:\/\/www.rbc.com\/en\/wp-content\/uploads\/sites\/4\/2025\/03\/Blog-Image-Template-ENERGY-REPORT_Banner-584x300-1.jpg\" alt=\"\" width=\"584\" height=\"300\" \/><\/a><\/p>\n<p class=\"mass-title-ra tx-left\"><a href=\"https:\/\/thoughtleadership.rbc.com\/canadas-energy-transformation-an-outlook-of-supply-and-demand-in-the-2030s\/\">Canada&#8217;s Energy Transformation: An Outlook of Supply and Demand In the 2030s<\/a><\/p>\n<\/div>\n<\/div>\n<h4><b>For more, go to <a href=\"https:\/\/www.rbc.com\/climate\">rbc.com\/climate<\/a>.<\/b><\/h4>\n<div class=\"rds-callout-white\" style=\"border: 1px solid #c4c8cc\">\n<div class=\"rds-gcw\">\n<div class=\"img w-mob-100 download-img\" style=\"vertical-align: top\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-57855\" src=\"https:\/\/www.rbc.com\/en\/wp-content\/uploads\/sites\/4\/2025\/03\/Download-PDF-button-02-7.png\" alt=\"\" width=\"1144\" height=\"724\" \/><\/div>\n<div class=\"rds-inline pad-hlf\" style=\"vertical-align: top\">\n<h4 class=\"mar-t\">Download the Report<\/h4>\n<p><a class=\"btn tertiary\" role=\"button\" href=\"https:\/\/www.rbc.com\/en\/wp-content\/uploads\/sites\/4\/2024\/11\/Power-Struggle-Report-2024.pdf\" target=\"_blank\" rel=\"noopener noreferrer\" data-dig-id=\"TNL_211020_1\" data-dig-category=\"TNL Economics\" data-dig-action=\"mid-funnel click\" data-dig-label=\"Ag Tech Report Final\">Download<\/a><\/p>\n<\/div>\n<\/div>\n<\/div>\n<style class=\"advgb-styles-renderer\">.main-box{padding:0px!important;margin:0px!important;}.main-box li{list-style:none;}.box{display: block;float: left;margin-bottom: 20px;}.bx-num{float: left;width: 6%;border: 1px solid #C3E4E5;border-radius: 50%;margin: 0 auto;padding: 8px 2px 8px 16px;background: #0091DA;color: white;font-size: 22px;}.bx-text{width: 84%;float: right;font-size: 16px;line-height: 1.4;}.sp-box-all{display:table;}.main-box{display: block;}.fl{float:left;}.fr{float:right;}.box{width:100%;}h2.sp-title {font-weight: 600;color: #00427A;text-align: left;margin-top: 40px !important;margin-bottom: 10px !important;}.key-finding-img {width: 10%;margin-right: 20px;float: left;}.key-finding-text {width: 85%;float: left;display: table-cell;}.key-finding li {list-style: none;float: left;margin-bottom: 10px;}.key-finding {margin: 40px 0;display: table;padding-left: 0!important;}.box-contri p {margin: 0;}.box-contri {background: #006AC3;padding: 25px;color: white;}.mass-timber-ra {flex: 25%;padding: 40px;}.mass-timber {flex: 25%;padding: 40px;background: #E7EEF1;}.tx-center {text-align: center;}p.mass-title-ra {font-size: 16px;padding-bottom: 0;color: #588886;font-weight: 500;margin: 0 0 8px 0;line-height: 1.3;}p.mass-title {font-size: 45px;padding-bottom: 0;color: #588886;font-weight: 500;}.mass-description {font-size: 15px;line-height: 1.2;}.mass-title-ra a {text-decoration: none;font-weight: 500;}.mass{display: flex;flex-wrap: wrap;margin-bottom: 40px;}.accordion .accordion-panel, .accordion .panel{margin: 0 0 20px 0;}.accordion-panel p{margin:0;padding:0;}@media screen and (max-width: 576px){.col-full-wd{display:none;}.for-m{display:block;margin-bottom:20px;}.col-half-lf {width: 100%;margin-right: 0;float: none;}.col-half-rt {width: 100%;float: none;}.key-finding{width:100%;padding: 0px!important;}.key-finding-img {width: 30%;float: none;margin: 0 auto 20px auto;}.key-finding-text {width: 100%;float: none;}.mass-timber-ra{flex: 100%;padding: 0;}.mass-timber-ra{flex: 100%;padding: 0;}.border-side-ra {margin: 20px 0;}}@media only screen and (min-width: 768px){.col-full-wd{display:none;}.for-m{display:block;margin-bottom:20px;}.col-half-lf {width: 100%;margin-right: 0;float: none;}.key-finding-text {width: 100%;float: none;}.key-finding-img {width: 15%;float: none;margin: 0 auto 20px auto;}.mass{padding: 0;flex-direction: column;}.mass-timber-ra{padding: 0;}}@media only screen and (min-width: 820px) {.col-full-wd{display:none;}.for-m{display:block;margin-bottom:20px;}.col-half-lf{width:48%;margin-right:10px;float:left;}.mass{flex-direction: row;}.mass-timber-ra{padding: 0;}.mass-timber-ra{flex: 100%;margin:0;}}@media only screen and (min-width: 992px) {.col-full-wd{display:none;}.for-m{display:block;margin-bottom:20px;}.mass{flex-direction: row;}.mass-timber-ra{flex: 25%;margin: 0;}.border-side-ra {margin: 0 10px;}}@media only screen and (min-width: 1024px) {.col-full-wd{display:none;}.for-m{display:block;margin-bottom:20px;}}@media only screen and (min-width: 1200px) {.col-full-wd{display:block;}.for-m{display:none;margin-bottom:20px;}.key-finding-img{width: 7%;float: left;margin-right:20px;}.download-img{width:275px;}}@media only screen and (min-width: 1276px){.col-full-wd{display:block;}.for-m{display:none;margin-bottom:20px;}}@media screen and (min-width: 2501px) and (max-width: 4000px) {.col-full-wd{display:block;}}<\/style>\n","protected":false},"excerpt":{"rendered":"<p>As AI transforms the world, Big Tech seeks energy to power data centers fueling the boom. How can Canada contribute to this global shift?<\/p>\n","protected":false},"author":300,"featured_media":9546,"parent":0,"menu_order":0,"template":"","meta":{"_acf_changed":false,"disable_focal_point":true,"featured_image_focal_point":{"x":0.5,"y":0.5},"advgb_blocks_editor_width":"","advgb_blocks_columns_visual_guide":"","footnotes":""},"rbc_tl_category":[130,204],"rbc_tl_tag":[107,126,99,103],"class_list":["post-9531","rbc_tl","type-rbc_tl","status-publish","has-post-thumbnail","hentry","rbc_tl_category-climate-action-institute","rbc_tl_category-energy-reports","rbc_tl_tag-artificial-intelligence","rbc_tl_tag-energy","rbc_tl_tag-innovation","rbc_tl_tag-technology"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v27.2 (Yoast SEO v27.2) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Power Struggle: How AI is challenging Canada\u2019s electricity grid - RBC<\/title>\n<meta name=\"description\" content=\"As AI transforms the world, Big Tech seeks energy to power data centers fueling the boom. How can Canada contribute to this global shift?\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.rbc.com\/en\/thought-leadership\/climate-action-institute\/energy-reports\/power-struggle-how-ai-is-challenging-canadas-electricity-grid\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Power Struggle: How AI is challenging Canada\u2019s electricity grid\" \/>\n<meta property=\"og:description\" content=\"As AI transforms the world, Big Tech seeks energy to power data centers fueling the boom. How can Canada contribute to this global shift?\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.rbc.com\/en\/thought-leadership\/climate-action-institute\/energy-reports\/power-struggle-how-ai-is-challenging-canadas-electricity-grid\/\" \/>\n<meta property=\"og:site_name\" content=\"RBC\" \/>\n<meta property=\"article:modified_time\" content=\"2026-04-16T17:06:46+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.rbc.com\/en\/wp-content\/uploads\/sites\/4\/2025\/03\/Power-struggle-AI-report-Blog-Image_Banner-wide_v2-scaled-1.jpg?quality=80\" \/>\n\t<meta property=\"og:image:width\" content=\"2560\" \/>\n\t<meta property=\"og:image:height\" content=\"1236\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"15 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.rbc.com\/en\/thought-leadership\/climate-action-institute\/energy-reports\/power-struggle-how-ai-is-challenging-canadas-electricity-grid\/\",\"url\":\"https:\/\/www.rbc.com\/en\/thought-leadership\/climate-action-institute\/energy-reports\/power-struggle-how-ai-is-challenging-canadas-electricity-grid\/\",\"name\":\"Power Struggle: How AI is challenging Canada\u2019s electricity grid - RBC\",\"isPartOf\":{\"@id\":\"https:\/\/www.rbc.com\/en\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.rbc.com\/en\/thought-leadership\/climate-action-institute\/energy-reports\/power-struggle-how-ai-is-challenging-canadas-electricity-grid\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.rbc.com\/en\/thought-leadership\/climate-action-institute\/energy-reports\/power-struggle-how-ai-is-challenging-canadas-electricity-grid\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.rbc.com\/en\/wp-content\/uploads\/sites\/4\/2025\/03\/Power-struggle-AI-report-Blog-Image_Banner-wide_v2-scaled-1.jpg?quality=80\",\"datePublished\":\"2024-12-04T05:00:52+00:00\",\"dateModified\":\"2026-04-16T17:06:46+00:00\",\"description\":\"As AI transforms the world, Big Tech seeks energy to power data centers fueling the boom. How can Canada contribute to this global shift?\",\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.rbc.com\/en\/thought-leadership\/climate-action-institute\/energy-reports\/power-struggle-how-ai-is-challenging-canadas-electricity-grid\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.rbc.com\/en\/thought-leadership\/climate-action-institute\/energy-reports\/power-struggle-how-ai-is-challenging-canadas-electricity-grid\/#primaryimage\",\"url\":\"https:\/\/www.rbc.com\/en\/wp-content\/uploads\/sites\/4\/2025\/03\/Power-struggle-AI-report-Blog-Image_Banner-wide_v2-scaled-1.jpg?quality=80\",\"contentUrl\":\"https:\/\/www.rbc.com\/en\/wp-content\/uploads\/sites\/4\/2025\/03\/Power-struggle-AI-report-Blog-Image_Banner-wide_v2-scaled-1.jpg?quality=80\",\"width\":2560,\"height\":1236},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.rbc.com\/en\/#website\",\"url\":\"https:\/\/www.rbc.com\/en\/\",\"name\":\"RBC\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.rbc.com\/en\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Power Struggle: How AI is challenging Canada\u2019s electricity grid - RBC","description":"As AI transforms the world, Big Tech seeks energy to power data centers fueling the boom. How can Canada contribute to this global shift?","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.rbc.com\/en\/thought-leadership\/climate-action-institute\/energy-reports\/power-struggle-how-ai-is-challenging-canadas-electricity-grid\/","og_locale":"en_US","og_type":"article","og_title":"Power Struggle: How AI is challenging Canada\u2019s electricity grid","og_description":"As AI transforms the world, Big Tech seeks energy to power data centers fueling the boom. How can Canada contribute to this global shift?","og_url":"https:\/\/www.rbc.com\/en\/thought-leadership\/climate-action-institute\/energy-reports\/power-struggle-how-ai-is-challenging-canadas-electricity-grid\/","og_site_name":"RBC","article_modified_time":"2026-04-16T17:06:46+00:00","og_image":[{"width":2560,"height":1236,"url":"https:\/\/www.rbc.com\/en\/wp-content\/uploads\/sites\/4\/2025\/03\/Power-struggle-AI-report-Blog-Image_Banner-wide_v2-scaled-1.jpg?quality=80","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"15 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.rbc.com\/en\/thought-leadership\/climate-action-institute\/energy-reports\/power-struggle-how-ai-is-challenging-canadas-electricity-grid\/","url":"https:\/\/www.rbc.com\/en\/thought-leadership\/climate-action-institute\/energy-reports\/power-struggle-how-ai-is-challenging-canadas-electricity-grid\/","name":"Power Struggle: How AI is challenging Canada\u2019s electricity grid - RBC","isPartOf":{"@id":"https:\/\/www.rbc.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.rbc.com\/en\/thought-leadership\/climate-action-institute\/energy-reports\/power-struggle-how-ai-is-challenging-canadas-electricity-grid\/#primaryimage"},"image":{"@id":"https:\/\/www.rbc.com\/en\/thought-leadership\/climate-action-institute\/energy-reports\/power-struggle-how-ai-is-challenging-canadas-electricity-grid\/#primaryimage"},"thumbnailUrl":"https:\/\/www.rbc.com\/en\/wp-content\/uploads\/sites\/4\/2025\/03\/Power-struggle-AI-report-Blog-Image_Banner-wide_v2-scaled-1.jpg?quality=80","datePublished":"2024-12-04T05:00:52+00:00","dateModified":"2026-04-16T17:06:46+00:00","description":"As AI transforms the world, Big Tech seeks energy to power data centers fueling the boom. How can Canada contribute to this global shift?","inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.rbc.com\/en\/thought-leadership\/climate-action-institute\/energy-reports\/power-struggle-how-ai-is-challenging-canadas-electricity-grid\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.rbc.com\/en\/thought-leadership\/climate-action-institute\/energy-reports\/power-struggle-how-ai-is-challenging-canadas-electricity-grid\/#primaryimage","url":"https:\/\/www.rbc.com\/en\/wp-content\/uploads\/sites\/4\/2025\/03\/Power-struggle-AI-report-Blog-Image_Banner-wide_v2-scaled-1.jpg?quality=80","contentUrl":"https:\/\/www.rbc.com\/en\/wp-content\/uploads\/sites\/4\/2025\/03\/Power-struggle-AI-report-Blog-Image_Banner-wide_v2-scaled-1.jpg?quality=80","width":2560,"height":1236},{"@type":"WebSite","@id":"https:\/\/www.rbc.com\/en\/#website","url":"https:\/\/www.rbc.com\/en\/","name":"RBC","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.rbc.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"}]}},"parsely":{"version":"1.1.0","canonical_url":"https:\/\/rbc.com\/en\/thought-leadership\/climate-action-institute\/energy-reports\/power-struggle-how-ai-is-challenging-canadas-electricity-grid\/","smart_links":{"inbound":0,"outbound":0},"traffic_boost_suggestions_count":0,"meta":{"@context":"https:\/\/schema.org","@type":"NewsArticle","headline":"Power Struggle: How AI is challenging Canada\u2019s  electricity grid","url":"http:\/\/www.rbc.com\/en\/thought-leadership\/climate-action-institute\/energy-reports\/power-struggle-how-ai-is-challenging-canadas-electricity-grid\/","mainEntityOfPage":{"@type":"WebPage","@id":"http:\/\/www.rbc.com\/en\/thought-leadership\/climate-action-institute\/energy-reports\/power-struggle-how-ai-is-challenging-canadas-electricity-grid\/"},"thumbnailUrl":"https:\/\/www.rbc.com\/en\/wp-content\/uploads\/sites\/4\/2025\/03\/Power-struggle-AI-report-Blog-Image_Banner-wide_v2-scaled-1.jpg?quality=80&w=150&h=150&crop=1","image":{"@type":"ImageObject","url":"https:\/\/www.rbc.com\/en\/wp-content\/uploads\/sites\/4\/2025\/03\/Power-struggle-AI-report-Blog-Image_Banner-wide_v2-scaled-1.jpg?quality=80"},"articleSection":"Uncategorized","author":[{"@type":"Person","name":"Shiplu Talukder"}],"creator":["Shiplu Talukder"],"publisher":{"@type":"Organization","name":"RBC","logo":""},"keywords":[],"dateCreated":"2024-12-04T05:00:52Z","datePublished":"2024-12-04T05:00:52Z","dateModified":"2026-04-16T17:06:46Z"},"rendered":"<script type=\"application\/ld+json\" class=\"wp-parsely-metadata\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@type\":\"NewsArticle\",\"headline\":\"Power Struggle: How AI is challenging Canada\\u2019s  electricity grid\",\"url\":\"http:\\\/\\\/www.rbc.com\\\/en\\\/thought-leadership\\\/climate-action-institute\\\/energy-reports\\\/power-struggle-how-ai-is-challenging-canadas-electricity-grid\\\/\",\"mainEntityOfPage\":{\"@type\":\"WebPage\",\"@id\":\"http:\\\/\\\/www.rbc.com\\\/en\\\/thought-leadership\\\/climate-action-institute\\\/energy-reports\\\/power-struggle-how-ai-is-challenging-canadas-electricity-grid\\\/\"},\"thumbnailUrl\":\"https:\\\/\\\/www.rbc.com\\\/en\\\/wp-content\\\/uploads\\\/sites\\\/4\\\/2025\\\/03\\\/Power-struggle-AI-report-Blog-Image_Banner-wide_v2-scaled-1.jpg?quality=80&w=150&h=150&crop=1\",\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.rbc.com\\\/en\\\/wp-content\\\/uploads\\\/sites\\\/4\\\/2025\\\/03\\\/Power-struggle-AI-report-Blog-Image_Banner-wide_v2-scaled-1.jpg?quality=80\"},\"articleSection\":\"Uncategorized\",\"author\":[{\"@type\":\"Person\",\"name\":\"Shiplu Talukder\"}],\"creator\":[\"Shiplu Talukder\"],\"publisher\":{\"@type\":\"Organization\",\"name\":\"RBC\",\"logo\":\"\"},\"keywords\":[],\"dateCreated\":\"2024-12-04T05:00:52Z\",\"datePublished\":\"2024-12-04T05:00:52Z\",\"dateModified\":\"2026-04-16T17:06:46Z\"}<\/script>","tracker_url":"https:\/\/cdn.parsely.com\/keys\/rbc.com\/p.js"},"featured_img":"https:\/\/www.rbc.com\/en\/wp-content\/uploads\/sites\/4\/2025\/03\/Power-struggle-AI-report-Blog-Image_Banner-wide_v2-scaled-1.jpg?quality=80&w=1024","coauthors":[],"author_meta":{"author_link":"https:\/\/www.rbc.com\/en\/author\/shiplutalukder\/","display_name":"Shiplu Talukder"},"relative_dates":{"created":"Posted 1 year ago","modified":"Updated 5 days ago"},"absolute_dates":{"created":"Posted on December 4, 2024","modified":"Updated on April 16, 2026"},"absolute_dates_time":{"created":"Posted on December 4, 2024 5:00 am","modified":"Updated on April 16, 2026 5:06 pm"},"featured_img_caption":"","tax_additional":{"rbc_tl_category":{"linked":["<a href=\"https:\/\/www.rbc.com\/en\/thought-leadership\/climate-action-institute\/\" class=\"advgb-post-tax-term\">Climate Action Institute<\/a>","<a href=\"https:\/\/www.rbc.com\/en\/thought-leadership\/energy-reports\/\" class=\"advgb-post-tax-term\">Energy Reports<\/a>"],"unlinked":["<span class=\"advgb-post-tax-term\">Climate Action Institute<\/span>","<span class=\"advgb-post-tax-term\">Energy Reports<\/span>"],"slug":"rbc_tl_category","name":"Categories"},"rbc_tl_tag":{"linked":["<a href=\"https:\/\/www.rbc.com\/en\/topics\/artificial-intelligence\/\" class=\"advgb-post-tax-term\">Artificial Intelligence<\/a>","<a href=\"https:\/\/www.rbc.com\/en\/topics\/energy\/\" class=\"advgb-post-tax-term\">Energy<\/a>","<a href=\"https:\/\/www.rbc.com\/en\/topics\/innovation\/\" class=\"advgb-post-tax-term\">Innovation<\/a>","<a href=\"https:\/\/www.rbc.com\/en\/topics\/technology\/\" class=\"advgb-post-tax-term\">Technology<\/a>"],"unlinked":["<span class=\"advgb-post-tax-term\">Artificial Intelligence<\/span>","<span class=\"advgb-post-tax-term\">Energy<\/span>","<span class=\"advgb-post-tax-term\">Innovation<\/span>","<span class=\"advgb-post-tax-term\">Technology<\/span>"],"slug":"rbc_tl_tag","name":"Tags"}},"series_order":"","_links":{"self":[{"href":"https:\/\/www.rbc.com\/en\/wp-json\/wp\/v2\/rbc_tl\/9531","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.rbc.com\/en\/wp-json\/wp\/v2\/rbc_tl"}],"about":[{"href":"https:\/\/www.rbc.com\/en\/wp-json\/wp\/v2\/types\/rbc_tl"}],"author":[{"embeddable":true,"href":"https:\/\/www.rbc.com\/en\/wp-json\/wp\/v2\/users\/300"}],"version-history":[{"count":1,"href":"https:\/\/www.rbc.com\/en\/wp-json\/wp\/v2\/rbc_tl\/9531\/revisions"}],"predecessor-version":[{"id":26018,"href":"https:\/\/www.rbc.com\/en\/wp-json\/wp\/v2\/rbc_tl\/9531\/revisions\/26018"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.rbc.com\/en\/wp-json\/wp\/v2\/media\/9546"}],"wp:attachment":[{"href":"https:\/\/www.rbc.com\/en\/wp-json\/wp\/v2\/media?parent=9531"}],"wp:term":[{"taxonomy":"rbc_tl_category","embeddable":true,"href":"https:\/\/www.rbc.com\/en\/wp-json\/wp\/v2\/rbc_tl_category?post=9531"},{"taxonomy":"rbc_tl_tag","embeddable":true,"href":"https:\/\/www.rbc.com\/en\/wp-json\/wp\/v2\/rbc_tl_tag?post=9531"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}